stuntmusic msmith at crsinc.com
Thu Apr 3 08:15:55 PDT 2008
I have an office that works on the master database of our application and I
want to set up a way for these users to work on a slave DB to keep them off
the production 'wire'

It appears that Slony-I can replicate the data DOWN to the slave easily
enough, but can it also handle replication UP, back to the production db?

For example, a user here needs to modify a record. They make the mod on the
slave DB. When or how does Slony-I get that mod back to the Master? Is there
a setting that allows me to set the refresh up to the master, or is it a
built in interval?

Thanks in advance.

- Marc
-- 
View this message in context: http://www.nabble.com/Data-from-slaves-pushed-back-to-master---Can-it-be-done--tp16467554p16467554.html
Sent from the Slony-I -- General mailing list archive at Nabble.com.



More information about the Slony1-general mailing list